Who funds each stage?
| Stage | Source and release conditions |
|---|---|
| Before construction | The owner, bank and CDC agree on eligible costs, cash contribution, interim terms and requirements for permanent funding. |
| While work is underway | The bank or other interim lender advances approved costs against progress. Inspections and any retained amount follow the construction loan agreement. |
| At permanent funding | The 504 debenture repays the eligible interim portion. The bank holds the first mortgage and the CDC holds the debenture-funded second mortgage. |
First mortgage 50% · CDC debenture 40% · Borrower equity 10% of eligible project costs in this example.
What must happen before takeout?
Takeout means replacing interim debt with the permanent financing. The interim lender certifies the amount advanced, and the CDC verifies completion against approved plans. The borrower, interim lender and CDC also complete the required financial certifications. Agree on final invoices, lien releases, evidence of occupancy and release of retainage, the portion held back until work is accepted. 504 interim funding and certifications
Plan for delays and overruns
Confirm the construction loan’s maturity and extension conditions before signing. An overrun may require an approved budget change or additional borrower cash. A delayed inspection can push permanent funding past the planned month. Model the extra interest and keep operating reserves separate. How a 504 project is financed · SBA occupancy rules
If a leased build-out or sizeable opening cash need is central to the project, compare 7(a) construction. Have lenders review the mix of expenses before you hire a contractor.
A manufacturer builds a $2.5 million facility
An established manufacturer plans a general-purpose building it will occupy. Assume $2.5 million of eligible project costs and an approved 50/40/10 structure. During construction, the interim lender advances draws. At permanent funding, 50% × $2.5 million is a $1.25 million first mortgage, 40% is a $1 million CDC loan, and 10% is a $250,000 owner contribution.
Operating cash needed after opening is a separate $150,000. Source to be determined. Document that source before finalizing the construction budget.
What to prepare
- Site control, plans, occupancy schedule and itemized construction contract
- Evidence of borrower equity and current financial statements
- Interim loan terms, draw and inspection schedule, retainage and maturity date
- Sources for operating reserves and cost overruns, plus completion and lien-release checklist
Share financial documents through the secure channel your lender provides.
Borrower questions
When does the CDC portion fund?
After completion, required certifications and satisfaction of closing conditions, debenture proceeds fund the permanent CDC loan and repay the eligible interim balance.
Is the first mortgage fixed too?
The bank negotiates that separately. Ask for its rate structure, amortization, maturity and any balloon alongside the fixed-rate CDC terms.
Where do operating reserves come from?
Ordinary working capital needs their own identified source, such as owner cash or a separate approved facility. Show the timing on the same cash forecast as the construction draws.
SBA 504 loans · How a 504 project is financed · 504 interim funding and certifications · 504 borrower contribution rules · SBA occupancy rules
Source check · November 20, 2026