How to Finance a Business Construction or Renovation Project

Decide first whether you will lease or own the site and how much cash you need between the first contractor invoice and your first customer payment. Compare a 7(a) request that includes eligible opening costs with a 504 fixed-asset project or a conventional construction facility.

Who pays during the build?

ProjectDraws, opening cash and permanent funding
Leased-space renovationA 7(a) lender can advance approved draws and consider eligible opening working capital. Review lease control, landlord consent, inspections and repayment terms before construction starts.
Ground-up owner-occupied facilityWith 504 financing, an interim lender advances draws. Permanent bank and CDC financing depends on completion, certifications and closing conditions. Fund operating cash separately.
Conventional construction-to-permanentThe bank funds approved draws on its schedule. Confirm what it requires to convert to a term mortgage, whether you must requalify and how operating reserves will be funded.
A project that needs a bridgeThe interim lender covers agreed costs. Confirm the permanent lender’s conditions, operating cash source and fallback before closing. For rural projects, ask about USDA filing and environmental review before starting work.

Match the draw schedule to the construction contract

Start with a contractor’s bid, plans, permits, inspection milestones and the date the building can legally be occupied. Identify deposits or materials payable before a lender inspection. Compare projected costs to comparable bids and projected cash flow to payments at opening.

A contingency covers changes in construction cost. Construction interest covers the carrying cost of advances. Reserve operating cash for the period between opening and collecting enough revenue. For a 504 loan, the interim lender verifies disbursements and the CDC must certify completion before permanent funding. 504 interim financing and completion, 13 CFR part 120

Put reimbursements on the date cash is due

Suppose a landlord offers $60,000 after issuing a certificate of occupancy. A $200,000 contractor bill still requires $200,000 in available cash or draws before that reimbursement arrives. List the $60,000 as a future receipt with its trigger and date. Ask who fronts the balance and how the lender applies the payment.

Illustrative example

Illustrative manufacturer build

For an established manufacturer with $2.5 million in eligible owner-occupied, general-purpose facility costs, a 50/40/10 structure would provide $1.25 million from the first-mortgage lender, $1 million through the CDC and $250,000 from the owner. During construction, the interim lender advances draws.

Additional operating cash of $150,000 brings total funding needs to $2.65 million. The source of the $150,000 is to be determined. Identify it before committing to the build. SBA 504 eligible uses

Build your sources-and-uses worksheet

Use dollars. Enter a landlord reimbursement only when it will be available. A payment due after completion leaves an interim cash need.

Uses
Sources available during the build
Total uses $0 · Available sources $0 · Funding gap $0

What to prepare

  • Site address and lease, signed letter of intent or land purchase contract
  • Plans, contractor qualifications and bids, permit status and milestone schedule
  • Budget for land, hard and soft costs, equipment, contingency, interest and opening cash
  • Funding sources with dates, post-completion occupancy and a delayed-opening cash forecast

Share financial documents through the secure channel your lender provides.

Borrower questions

How is my contractor paid?

Your loan agreement defines the draw process. Typically the lender reviews an invoice, evidence of progress and required inspections before releasing funds. Confirm deposits and any amount held until completion.

Can land I already own count as equity?

Land that is part of an eligible 504 project may count toward the contribution. The lender and CDC review title, liens, value and the amount they can credit before you count it in the budget.

What happens if opening slips?

Recalculate interest, rent, payroll and any extension fees through the later opening date. Agree with the lender on the funding source for the gap and whether the delay changes the permanent loan conditions.